Add Papers Marked0
Paper checked off!

Marked works

Viewed0

Viewed works

Shopping Cart0
Paper added to shopping cart!

Shopping Cart

Register Now

eKönyvtár library
FAQ
 

Great deal: today with a discount!

Regular price:
1 435 Ft
You save:
230 Ft
Discounted price*:
1 205 Ft
Purchase
Add to Wish List
ID number:526926
Author:
Evaluation:
Published: 25.02.2010.
Language: English
Level: Secondary school
Literature: 1 units
References: Not used
Extract

Introduction
The Southern Bridge is presently the biggest construction project in Latvia and its capital city - Riga
The presentations topic is connected with my future profession
This topic mentions a problem of crisis and building in my country.
Project of the Bridge
The task of the bridge is to ensure the traffic flow between the south-western part of Pardaugava and the areas of Riga’s right bank – Latgales and Vidzemes suburbs, Ziemeļu district, without crossing the city centre and thus reducing congestion. The bridge will also allow transit traffic to go around the city centre – in the direction of Jelgava, Bauska, Ogre, Sigulda, Saulkrasti, Vecmligravis and Carnikava. The new bridge will also reduce the traffic flow in Krasta Street and 11 Novembra Embankment, as well as that crossing Salu tilts (the Island Bridge). The traffic capacity of the transit highway “Via Baltica” will also increase.
Work on the development of the Southern Bridge project started in 2002, when the City Development Department of the Riga City Council developed the design task for the route of the Southern Bridge, which would connect Vienibas Gatve on the left bank of the Daugava and the Slavu roundabout on the right bank of the river Daugava.
The chief designer of the bridge sketch design was “Tiltprojekts” Ltd. (Manager - G.Rusinov), but the bridge construction for the so-called strut frame or small guy-wire bridge system was designed by the St. Petersburg Design Institute “Institut Giprostroimost Sankt-Peterburg” (Chief Engineer - I.Koļusev). The development of the bridge architecture and design was entrusted to the design group “Arhitektonika” (Chief Architect I.Lazdins) after an international meeting organised by the Riga City Council concerning the architectural and construction solutions for the Southern Bridge. The guyed bridge system allows the distance between the bridge piers to be considerably increased, thus making the bridge visually much more attractive. …

Author's comment
Load more similar papers

Send to email

Your name:

Enter an email address where the link will be sent:

Hi!
{Your name} suggests you to check out this eKönyvtár paper on „The Southern Bridge”.

Link to paper:
https://eng.ekonyvtar.eu/w/526926

Send

Email has been sent

Choose Authorization Method

Email & Password

Email & Password

Wrong e-mail adress or password!
Log In

Forgot your password?

Facebook

Not registered yet?

Register and redeem free papers!

To receive free papers from eKönyvtár.com it is necessary to register. It's quick and will only take a few seconds.

If you have already registered, simply to access the free content.

Cancel Register